|
Replace Harvesters Slurry Pipelines
|
|
|
|
|
|
|
|
|
Replace Harvesters Slurry Pipelines (Carbon Steel Size 12 Inch.) (14,000 Meter)
|
|
|
|
|
|
|
|
|
مشروع صيانة هنجر صيانة الشاحنات - شركة البوتاس العربية
|
|
|
|
|
|
|
|
|
Supply, Design, Installation and Commissioning of Racking Systems at APC Main Warehouse
|
|
|
|
|
|
|
|
|
Design, Manufacture, Supply and Install Four Units of Sand Filters at Hot Leach Plant
|
|
|
|
|
|
|
|
|
Design, Manufacture, Supply and Install Four Units of Sand Filters at Hot Leach Plant
|
|
|
|
|
|
|
|
|
الدراسات الهندسية الأساسية لجميع حامض الفوسفوريك والأسمدة المتخصصة
|
|
|
|
|
|
|
|
|
Soil Replacement for General Garage Yard
|
|
|
|
|
|
|
|
|
Supply, Design, Installation and Commissioning of Racking Systems at APC Main Warehouse
|
|
|
|
|
|
|
|
|
Supply, fabrication, installation, and commissioning of a High
|
|
|
|
|
|
|
|
|
مشروع صيانة هنجر صيانة الشاحنات - شركة البوتاس العربية
|
|
|
|
|
|
|
|
|
Supply, fabrication, installation, and commissioning of a High-Density Polyethylene (HDPE) floating pipeline system with floaters for APC harvesters
|
|
|
|
|
|
|
|
|
بيع مواد وقطع غيار جديده مختلفه عن طريق المزاوده
|
|
|
|
|
|
|
|
|
مشروع صيانه هنجر صيانه الشاحنات شركه البوتاس العربيه
|
|
|
|
|
|
|
|
|
بيع مواد مختلفه مستهلكه سكراب
|
|
|
|
|
|
|
|
|
Supply, Design, Installation and Commissioning of Racking Systems at APC Main Warehouse
|
|
|
|
|
|
|
|
|
Soil Replacement for General Garage Yard
|
|
|
|
|
|
|
|
|
Supply of Tracks Undercarriage Assemblies for Harvesters
|
|
|
|
|
|
|
|
|
Supply of Tracks Undercarriage Assemblies for Harvesters
|
|
|
|
|
|
|
|
|
Fabricate & install a new 12" HLP tails line of about 900 meters
|
|
|
|
|
|
|
|
|
Fabricate & install new 12” HLP tails line of about 900 meters
|
|
|
|
|
|
|
|
|
Fabricate & install a new 12" HLP tails line of about 900 meters
|
|
|
|
|
|
|
|
|
Construction of Boundary Wall, Yards, Security Gates, Weighing Scale, and Ancillary Buildings – at APC Aqaba Site
|
|
|
|
|
|
|
|
|
Construction of Boundary Wall, Yards, Security Gates, Weighing Scale, and Ancillary Buildings – at APC Aqaba Site
|
|
|
|
|
|
|
|
|
Prequalification of Earthworks and Specialized Geomembrane Works for the construction of Carnallite Ponds
|
|
|
|
|
|
|
|
|
Prequalification of Earthworks and Cut-off wall supply and installation for the construction of Salt Ponds
|
|
|
|
|
|
|
|
|
Prequalification of Construction of New Cold Crystallization Plant (CCP3) Project
|
|
|
|
|
|
|
|
|
Prequalification of Earthworks and Specialized Geomembrane Works for the Construction of Carnallite Ponds
|
|
|
|
|
|
|
|
|
Prequalification of Earthworks and Cut-off Wall Supply and Installation for the Construction of Salt Ponds
|
|
|
|
|
|
|
|
|
Prequalification of Construction of New Cold Crystallization Plant (CCP3) Project
|
|
|
|
|
|
|
|
|
Prequalification of Construction of New Cold Crystallization Plant (CCP3) Project
|
|
|
|
|
|
|
|
|
انشاء مبنى مشغل المكيفات في شركة البوتاس العربية
|
|
|
|
|
|
|
|
|
Remedial works for phase 1 of Hydrological Study for East Side of APC Plant
|
|
|
|
|
|
|
|
|
انشاء مبنى مشغل المكيفات
|
|
|
|
|
|
|
|
|
Remedial Works for Phase I of Hydrological Study for East Side APC Plant
|
|
|
|
|
|
|
|
|
Asphalt Works in APC Sites
|
|
|
|
|
|
|
|
|
Asphalt Works in APC Sites - Phase 3
|
|
|
|
|
|
|
|
|
Supply of Carbon Steel Pipes & Fittings for General Use
|
|
|
|
|
|
|
|
|
توريد أنابيب ووصلات من الفولاذ الكربوني للاستخدام العام
|
|
|
|
|
|
|
|
|
construction of electrical overhead lines for the southern Expansion Project
|
|
|
|
|
|
|
|
|
Construction of Electrical Overhead Lines for the Southern Expansion Project
|
|
|
|
|
|
|
|
|
Construction of Electrical Overhead Lines for the Southern Expansion Project (Package No. 2)
|
|
|
|
|
|
|
|
|
Supply of three units of tipper trucks (25-ton capacity
|
|
|
|
|
|
|
|
|
Supply of thee unit of tipper trucks
|
|
|
|
|
|
|
|
|
Supply of Wheel Loader for Aqaba Site
|
|
|
|
|
|
|
|
|
Construction of Potash Storage Warehouses (Red And White) for the new CCP3 Plant
|
|
|
|
|
|
|
|
|
Southern Expansion Projects - Package
|
|
|
|
|
|
|
|
|
Southern Expansion project – Package No.06 – Bridge No.02 مشروع التوسعة الجنوبية – الحزمة رقم 06 – الجسر رقم 02
|
|
|
|
|
|
|
|
|
Construction of Potash Storage Warehouses (Red And White) for the new CCP3 Plant
|
|
|
|
|
|
|
|
|
Replace harvesters’ slurry lines inside the HLP about 1100 m
|
|
|
|
|
|
|
|